
![]() | ![]() |
---|---|
![]() .jpg | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
Athabasca Fire Services Chief Bryan Hall was looking for a training structure that met their immediate needs at a good price, but could also be Phase 2 ready.
Athabasca, AB
This structure features:
-
3 - 40' containers with 4 doors, 4 windows and openings between units.
-
A ground floor 10' Class A burn room.
-
Concrete floors throughout.
-
Interior stairs for below grade attack.
-
A 12' interior maze with steel movable walls
-
one day of training
Work In Progress
Completion Date: Sept 2015
Bryan Hall
Athabasca County Fire Services
780-675-6620
Fire Training Solutions was absolutely fantastic to work with. From design to build working with Richard and Mike has been a pleasure. Incorporating design and functionality while keeping it on price was a must and Fire Training Solutions definitely delivered. Thanks for the great facility, would definitely recommend using Fire Training Solutions in the future.
